General Information
Project Type
Structure: |
Two-hinged arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Function / usage: |
Tramway, light or metro rail bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Vienna 2 (Leopoldstadt), Vienna, Austria Vienna 3 (Landstrasse), Vienna, Austria |
---|---|
Crosses: |
|
Part of: | |
Replaces: |
Franzensbrücke (1899)
|
Coordinates: | 48° 12' 48" N 16° 23' 28" E |
Technical Information
Dimensions
main span | 52.8 m | |
width | 24.2 m | |
span lengths | 8.3 m - 52.8 m - 8.3 m | |
number of spans | 3 | |
number of tracks | 2 | |
number of lanes | 2 x 2 | |
track gauge | 1 435 mm | |
abutments | number | 2 |
Design Loads
Refurbishment | ||
---|---|---|
design code(s) | ÖN B4008-2 |
Materials
arch |
steel
|
---|---|
deck slab |
reinforced concrete
|
abutments |
masonry
|
Chronology
25 September 1948 | Opening. |
---|
Participants
Initial construction (1946-1948)
Owner
Refurbishment (2020-2022)
Owner
Traffic engineering
Structural engineering
Contractor
Relevant Web Sites
Relevant Publications
- Brücken in Wien. Ein Führer durch die Baugeschichte. Springer, Vienna (Austria), pp. 111-112. (2005):
- (2022): Refurbishment of Franzensbrücke in Vienna- Retrofitting a historical steel arch bridge with composite plate in between limited timeframe, restrictive urban environment, and challenging structural requirements. Presented at: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, pp. 845-852.
- About this
data sheet - Structure-ID
20004411 - Published on:
26/07/2002 - Last updated on:
26/10/2024