General Information

Beginning of works: 2000
Completion: 2002
Status: in use

Project Type

Awards and Distinctions

2006 entry  

Location

Location: , ,
, ,
Carries:
  • Bundesstrasse B 5
Crosses:
  • Oder/Odra River
Coordinates: 52° 20' 53.32" N    14° 33' 22" E
Show coordinates on a map

Technical Information

Dimensions

total length 251.75 m
span lengths 27.8 m - 75.0 m - 50.0 m - 50.0 m - 48.95 m
number of spans 5
bridge surface 3 550 m²
arches width 1.1 m
rise 12.0 m
arch span 75.00 m
on-center distance between girders 16.1 m
depth 0.85 - 1.70 m
deck deck depth 2.23 m
deck width 14.10 m

Quantities

structural steel 1 350 t (S355J2G3)
concrete volume 1 700 m³
reinforcing steel 650 t
concrete for foundations and substructure 2 500 m³
submerged concrete volume 450 m³
excavated material 2 000 m³

Cost

cost of construction Euro 11 000 000

Materials

deck composite
piers reinforced concrete
arches steel

Chronology

November 2000

Beginning of construction.

December 2002

Completion.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20006062
  • Published on:
    09/10/2002
  • Last updated on:
    12/03/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine