General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Location
Location: |
Bouliac, Gironde (33), Nouvelle-Aquitaine, France Bègles, Gironde (33), Nouvelle-Aquitaine, France |
---|---|
Crosses: |
|
Coordinates: | 44° 48' 27.73" N 0° 31' 38.25" W |
Technical Information
Dimensions
total length | 2 x 642 m | |
span lengths | 63 m - 5 x 102 m - 69 m | |
number of spans | 7 | |
deck | deck width | 14 m |
Cost
cost of construction | French Franc 161 000 000 |
Materials
superstructure |
prestressed concrete
|
---|
Participants
Owner
Client
Design
Architecture
Co-contractor
Relevant Web Sites
Relevant Publications
- Exécution du pont d'Arcins. In: Ouvrages d'art, n. 12 (July 1992), pp. 2-5. (1992):
- Le Pont d'Arcins sur la Garonne à Bordeaux. Presented at: Technique française du béton précontraint, Congrés FIP Washington, 1994. (1994):
- Rocade rive droite de l'agglomération bordelaise. Le pont d'Arcins sur la Garonne. In: Travaux, n. 686 (April 1993), pp. 45-51. (1993):
- About this
data sheet - Structure-ID
20004510 - Published on:
16/08/2002 - Last updated on:
13/08/2016