• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Fort McHenry Tunnel

General Information

Beginning of works: 1980
Completion: 23 November 1985
Status: in use

Project Type

Structure: Immersed tube tunnel
Function / usage: Road tunnel
Construction method: Immersed tube method

Awards and Distinctions

1986 Award of Merit  

Location

Location: , ,
For:
  • Interstate I-95
Part of:
Coordinates: 39° 15' 51.51" N    76° 35' 23.55" W
Coordinates: 39° 15' 50.08" N    76° 33' 58.50" W
Show coordinates on a map

Technical Information

Dimensions

tunnel length 2.4 km

Cost

cost of construction United States dollar 750 000 000

Materials

tunnel structure reinforced concrete

Chronology

24 November 1985

Opening.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20002477
  • Published on:
    04/12/2001
  • Last updated on:
    29/04/2021