0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Tunnel Forst
Completion: 1991
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel
Construction method: Cut-and-cover method

Location

Location: , , ,
Part of:
Coordinates: 49° 10' 1.67" N    8° 34' 17.42" E
Coordinates: 49° 9' 40.68" N    8° 35' 36.99" E
Show coordinates on a map

Technical Information

Dimensions

total length 3.22 km
number of tracks 2
tunnel clear interior profile 12.30 m x 7.81 m
tunnel length 1 726.5 m

Participants

Owner
Original design
Structural engineering
Construction supervision

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20012524
  • Published on:
    25/07/2004
  • Last updated on:
    23/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine