General Information

Beginning of works: 2009
Completion: 2011
Status: in use

Project Type

Location

Location: , , ,
Address: SS 3bis - E45
Replaces: Fornello Viaduct
Coordinates: 43° 47' 42.07" N    11° 59' 55.24" E
Show coordinates on a map

Technical Information

Dimensions

total length 340 m
span lengths 51.84 m - 114.97 m - 51.84 m
number of spans 3

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders weathering steel

Notes

The bridge replaces a twin prestressed concrete box girder which significant deformation problems at mid-span. The steel deck is assembled on the deck it is meant to replace then moved onto temporary supports alongside the concrete girder which is then demolished and the piers are strengthened. Afterwards the steel deck is moved into the position of the original deck and the concrete deck slab is cast. This way, traffic can be diverted onto the other span which remains in service during construction. The second girder is then replaced after traffic is moved onto the first new steel girder and the process is repeated.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20058385
  • Published on:
    29/09/2010
  • Last updated on:
    18/07/2016