General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Material: |
Steel-concrete composite bridge |
Structure: |
Haunched girder bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Verghereto, Forlì-Cesena, Emilia-Romagna, Italy |
---|---|
Address: | SS 3bis - E45 |
Replaces: |
Fornello Viaduct
|
Coordinates: | 43° 47' 42.07" N 11° 59' 55.24" E |
Technical Information
Dimensions
total length | 340 m | |
span lengths | 51.84 m - 114.97 m - 51.84 m | |
number of spans | 3 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
weathering steel
|
Notes
The bridge replaces a twin prestressed concrete box girder which significant deformation problems at mid-span. The steel deck is assembled on the deck it is meant to replace then moved onto temporary supports alongside the concrete girder which is then demolished and the piers are strengthened. Afterwards the steel deck is moved into the position of the original deck and the concrete deck slab is cast. This way, traffic can be diverted onto the other span which remains in service during construction. The second girder is then replaced after traffic is moved onto the first new steel girder and the process is repeated.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2010): The new Fornello viaduct: method of seismically strengthening the piers and replacing the deck without interrupting traffic. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 398-399.