General Information
Completion: | 1960s |
---|---|
Status: | demolished |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Verghereto, Forlì-Cesena, Emilia-Romagna, Italy |
---|---|
Address: | SS 675 |
Replaced by: |
Fornello Viaduct (2011)
|
Coordinates: | 43° 47' 41.62" N 11° 59' 55.71" E |
Technical Information
Dimensions
total length | 219.0 m | |
span lengths | 52.0 m - 115.0 m - 52.0 m | |
number of spans | 3 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2010): The new Fornello viaduct: method of seismically strengthening the piers and replacing the deck without interrupting traffic. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 398-399.
- About this
data sheet - Structure-ID
20058384 - Published on:
29/09/2010 - Last updated on:
05/02/2016