General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Double T-section girder bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Meppen, Emsland, Lower Saxony, Germany |
---|---|
Address: | Meppener Straße (Kreisstraße 203) |
Coordinates: | 52° 42' 45.70" N 7° 14' 23.55" E |
Technical Information
Dimensions
total length | 211 m | |
span lengths | 28 - 32.50 m | |
number of spans | 7 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|