Flutbrücke III der Ortsumgehung Bernburg

General Information

Official designation: 4136706 (BW 103.2A)
Beginning of works: November 2011
Completion: May 2014
Status: in use

Project Type

Location

Location: , , ,
Connects to: Saalebrücke der Ortsumgehung Bernburg (2014)
Coordinates: 51° 48' 24.03" N    11° 46' 48.13" E
Show coordinates on a map

Technical Information

Dimensions

total length 256.00 m
span lengths 23.00 m - 7 x 30.00 m - 23.00 m
deck width 16.35 m
number of spans 9
bridge surface 4 186 m²
deck girder depth 1.50 m
number of lanes 1 + 2
roadway / carriageway width 12.75 m

Quantities

deck concrete volume 3 467 m³
prestressing steel 116 t
reinforcing steel 445 t
piles total length of piles 1 311 m
substructure concrete volume 1 481 m³
reinforcing steel 292 t

Design Loads

live load Brückenklasse 60/30
MLC 50/50-100
special live load 1 800 kN (9 x 200 kN)
design code(s) DIN FB 101

Cost

cost of construction ca. Euro 5 800 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20072786
  • Published on:
    30/03/2017
  • Last updated on:
    30/03/2017