General Information
Official designation: | 4136703 (BW 103A) |
---|---|
Beginning of works: | July 2013 |
Completion: | December 2014 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Double T-section girder bridge |
Construction method: |
Span-by-span in-situ casting on falsework |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bernburg (Saale), Salzlandkreis, Saxony-Anhalt, Germany |
---|---|
Coordinates: | 51° 48' 32.01" N 11° 45' 24.27" E |
Technical Information
Dimensions
total length | 226.00 m | |
span lengths | 20.l25 m - 7 x 26.50 m - 20.25 m | |
deck width | 16.35 m | |
number of spans | 9 | |
bridge surface | 3 695 m² | |
deck | girder depth | 1.25 m |
number of lanes | 2 + 1 | |
roadway / carriageway width | 12.75 m |
Quantities
deck | concrete volume | 2 501 m³ |
prestressing steel | 84 t | |
reinforcing steel | 347 t | |
piles | total length of piles | 1 126 m |
substructure | concrete volume | 1 420 m² |
reinforcing steel | 198 t |
Design Loads
live load |
Brückenklasse 60/30 MLC 50/50-100 |
|
special live load | 1 800 kN (9 x 200 kN) | |
design code(s) | DIN FB 101 |
Cost
cost of construction | ca. Euro 6 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Design consultants
Structural engineering
Soil investigation report
Checking engineering
- Peter Gulde (checking engineer)
Contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2016. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2016, pp. 109-132.
- About this
data sheet - Structure-ID
20072784 - Published on:
30/03/2017 - Last updated on:
30/03/2017