0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Fleissenbachtalbrücke Bad Brambach

General Information

Beginning of works: March 2000
Completion: August 2001
Duration of works: 18 months
Status: in use

Project Type

Location

Location: , , ,
Address: B 92
Crosses:
  • Fleissenbach
Coordinates: 50° 13' 13.10" N    12° 19' 6.91" E
Show coordinates on a map

Technical Information

Dimensions

total length 159.00 m
bridge surface 1 829 m²
arch arch span 72.30 m
deck span lengths 4 x 13.00 m - 2 x 12.00 m - 3 x 11.00 m - 2 x 12.00 m - 2 x 13.00 m
deck width 11.00 m
number of spans 13

Quantities

arch concrete volume 938 m³
reinforcing steel 116 t
deck concrete volume 1 025 m³
concrete volume 135 m³
reinforcing steel 187 t
substructure concrete volume 1 362 m³
concrete volume 316 m³
reinforcing steel 176 t

Cost

cost of construction Euro 2 800 000

Materials

deck reinforced concrete
piers reinforced concrete
arch reinforced concrete
abutments reinforced concrete

Chronology

March 2000

Construction begins.

August 2001

End of construction.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007730
  • Published on:
    11/01/2003
  • Last updated on:
    18/05/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine