General Information
Other name(s): | Pfyn Tunnel |
---|---|
Completion: | 2019 |
Status: | under construction |
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Construction method: |
Cut-and-cover method |
Location
Location: |
Leuk, Valais, Switzerland Salgesch, Valais, Switzerland |
---|---|
Part of: | |
Coordinates: | 46° 17' 55.93" N 7° 36' 2.18" E |
Coordinates: | 46° 17' 25.51" N 7° 33' 58.05" E |
Technical Information
Dimensions
length | 4 200 m | |
number of lanes | 2 x 2 | |
number of tubes | 2 |
Quantities
concrete volume | 160 000 m³ | |
reinforcing steel | 30 000 t | |
volume of extracted material | 1 000 000 m³ |
Materials
tunnel structure |
reinforced concrete
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20043827 - Published on:
22/02/2009 - Last updated on:
28/05/2021