General Information
Completion: | April 1996 |
---|---|
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with harp system |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Construction method: |
Longitudinal launching |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
La Peza, Granada, Andalusia, Spain |
---|---|
See also: |
Francisco Abellán Dam (1998)
|
Coordinates: | 37° 18' 45.07" N 3° 15' 18.77" W |
Technical Information
Dimensions
span lengths | 2 x 45 m | |
number of spans | 2 | |
deck slab thickness | 0.20 m |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
pylons |
steel
|
Participants
Owner
Design
- Jordi Revoltós (designer)
- José Antonio Llombart (designer)
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Cable-Stayed Pedestrian Bridge, Spain. In: Structural Engineering International, v. 6, n. 4 (November 1996), pp. 222-223. (1996):
- Estructura atirantada para acceso a la torre de toma en el embalse Francisco Abellán. Río Fardes (Granada). In: Hormigón y acero, v. 47, n. 201 (3rd Quarter 1996), pp. 81-94. (1996):
- About this
data sheet - Structure-ID
20007580 - Published on:
04/01/2003 - Last updated on:
21/04/2016