Estructura atirantada para acceso a la torre de toma en el embalse Francisco Abellán. Río Fardes (Granada)
Author(s): |
José Antonio Llombart
Jordi Revoltós Fort |
---|---|
Medium: | journal article |
Language(s): | Spanish |
Published in: | Hormigón y acero, 3rd Quarter 1996, n. 201, v. 47 |
Page(s): | 81-94 |
Abstract: |
Cable stayed footbridge, to access the intake tower of the Francisco Abellán DamThis paper describes a cable stayed footbridge, built to access the intake tower of the Francisco Abellán Dam. The footbridge is a symmetric structure with two spans of 45,00 m each, and a composite box girder. The construction was done by launching the wall steel structure from one hillside, in order to avoid expensive lifting means due to high cliff. |
Available from: |