General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Farchant, Garmisch-Partenkirchen (Kreis), Bavaria, Germany |
---|---|
Part of: | |
Coordinates: | 47° 32' 3.21" N 11° 7' 11.72" E |
Coordinates: | 47° 30' 59.15" N 11° 6' 45.53" E |
Technical Information
Dimensions
clear interior profile | 9.50 x 4.50 m | |
number of tubes | 2 | |
eastern tube | length | 2 390 m |
western tube | length | 2 275 m |
Quantities
concrete volume | 88 000 m³ | |
reinforcing steel | 10 000 t | |
volume of extracted material | 650 000 m³ |
Cost
cost of construction | German Mark 255 000 000 |
Materials
tunnel structure |
reinforced concrete
|
---|
Chronology
October 1995 | Beginning of construction. |
---|---|
June 2000 | End of construction. |
Participants
Owner
Client
Original design
Structural engineering
Checking engineering
- K. Schikora (checking engineer)
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2001. Deutscher Bundes-Verlag, Bonn (Germany), 2001, pp. 135-152.
- Tunnel Farchant Geologie, Vortrieb, Berechnungen und Messungen. In: Bauingenieur, v. 75, n. 12 (December 2000), pp. 25+. (2000):
- Tunnel Farchant – Abdichtungs- und Entwässerungssystem. In: Bauingenieur, v. 76, n. 9 (September 2001), pp. 379+. (2001):
- About this
data sheet - Structure-ID
20004067 - Published on:
02/07/2002 - Last updated on:
04/04/2022