0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Tunnel Farchant
Beginning of works: 1995
Completion: June 2000
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
Part of:
Coordinates: 47° 32' 3.21" N    11° 7' 11.72" E
Coordinates: 47° 30' 59.15" N    11° 6' 45.53" E
Show coordinates on a map

Technical Information

Dimensions

clear interior profile 9.50 x 4.50 m
number of tubes 2
eastern tube length 2 390 m
western tube length 2 275 m

Quantities

concrete volume 88 000 m³
reinforcing steel 10 000 t
volume of extracted material 650 000 m³

Cost

cost of construction German Mark 255 000 000

Materials

tunnel structure reinforced concrete

Chronology

October 1995

Beginning of construction.

June 2000

End of construction.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004067
  • Published on:
    02/07/2002
  • Last updated on:
    04/04/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine