General Information
Other name(s): | Staldbach-Grosshus Tunnel |
---|---|
Completion: | 13 April 2018 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Visp, Valais, Switzerland |
---|---|
Address: | A9 |
Part of: | |
Coordinates: | 46° 17' 49.13" N 7° 55' 36.85" E |
Coordinates: | 46° 16' 40.08" N 7° 53' 4.79" E |
Coordinates: | 46° 16' 33" N 7° 52' 57.49" E |
Technical Information
Dimensions
tube 1 | length | 4 310 m |
tube 2 | length | 4 279 m |
Case Studies and Applied Products
Steel Fibre Shotcrete in Tunnelling: State of the Art and Examples
There are many possibilities and reasons for the application of steel fibre concrete in tunnelling, which account for the manifold number of existing uses. The shotcreting construction method has been state ... [more]
Chronology
13 April 2018 | Opened to traffic |
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20065366 - Published on:
08/06/2013 - Last updated on:
28/05/2021