General Information
Completion: | 1992 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Cable-stayed bridge with fan system |
Material: |
Prestressed concrete bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Chalcis, Euboea, Central Greece, Greece |
---|---|
Coordinates: | 38° 26' 53.01" N 23° 35' 31.30" E |
Coordinates: | 38° 26' 30.50" N 23° 35' 23.46" E |
Technical Information
Dimensions
main span | 215 m | |
length of side spans | 90 m | |
deck | deck depth | 450 mm |
deck width | 14.14 m |
Materials
cables |
steel
|
---|---|
deck |
prestressed concrete
|
pylons |
reinforced concrete
|
Participants
Design
- DOMI S.A.
-
schlaich bergermann partner
- Jörg Schlaich (designer)
- Andreas Keil (structural engineer)
Technical advisor to the owner
Structural engineering
Stay cables
Formwork
Monitoring
Monitoring equipment
Relevant Web Sites
Relevant Publications
- The Art of Structural Engineering. The Work of Jörg Schlaich. Edition Axel Menges, Stuttgart (Germany), pp. 172-3. (1997):
- Evaluation of dynamic response and local soil effects of the Evripos cable-stayed bridge using multi-sensor monitoring systems. In: Engineering Geology, v. 79, n. 1-2 (June 2005), pp. 43-59. (2005):
- Evripos Bridge nears Completion. In: VSL News, v. 4, n. 2 ( 1993), pp. 12. (1993):
- leicht weit / Light Structures. Jörg Schlaich / Rudolf Bergermann. Prestel Verlag, Munich (Germany), pp. 197. (2004):
- Multiple support seismic excitation of the Evripos bridge based on free-field and on-structure recordings. In: Structure and Infrastructure Engineering, v. 11, n. 11 (December 2015), pp. 1510-1523. (2015):
- About this
data sheet - Structure-ID
20000307 - Published on:
10/06/1999 - Last updated on:
05/02/2016