0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1995
Completion: 1996
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 61° 25' 10.29" N    11° 5' 1.71" E
Show coordinates on a map

Technical Information

Dimensions

height 6.5 m
total length 180 m
span lengths 5 x 36 m
number of spans 5

Materials

deck wood
piers reinforced concrete
truss glued laminated timber (glulam)

Chronology

1994

Project is started.

1996

Completion.

Notes

The superstructure was pre-assembled on site and then lifted into place. Total assembly time was 2 months. Deck and railing were added afterwards.

It is one of the longest wood bridges in the world for full traffic load.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20009003
  • Published on:
    15/04/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine