General Information
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Movable Scaffolding System |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wingerode, Eichsfeld (Kreis), Thuringia, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 51° 23' 59.06" N 10° 15' 2.09" E |
Technical Information
Dimensions
total length | 523 m | |
span lengths | 35 m - 45 m - 3 x 50 m - 4 x 62 m - 45 m | |
number of spans | 10 | |
height above valley floor or water | 45 m | |
girder depth | 3.70 m |
Quantities
concrete volume | 25.000 m³ |
Cost
cost of construction (incl. taxes) | ca. Euro 14 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Contractor
Subcontractor
Bearings
Expansion joints
Scaffolding
Construction supervision
Surveying
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- 523 m lange Brücke über das Etzelsbachtal. In: Beton- und Stahlbetonbau, v. 97, n. 3 (March 2002), pp. 156.
- About this
data sheet - Structure-ID
20007159 - Published on:
08/12/2002 - Last updated on:
12/07/2017