General Information
Name in local language: | Estequerung |
---|---|
Beginning of works: | 5 October 2015 |
Completion: | 19 November 2018 |
Status: | completed |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Buxtehude, Stade (Kreis), Lower Saxony, Germany |
---|---|
Carries: |
A 26 Motorway (Germany)
|
Coordinates: | 53° 29' 16.20" N 9° 42' 33.91" E |
Technical Information
Dimensions
total length | 200.727 m | |
span lengths | 46.90 m - 2 x 53.50 m - 46.83 m | |
number of spans | 4 | |
bridge surface | 5 990 m² | |
number of lanes | 2 x 2 | |
roadway / carriageway width | 2 x 11.50 m | |
superelevation | 2.5 % | |
deck | deck depth | 2.33 m |
deck width | 29.84 m | |
on-center distance between girders | 7.50 m | |
deck slab thickness | 0.35 - 0.55 m | |
girder depth | 1.875 m | |
piles | diameter | 0.61 m (1-3, B) 1.20 m (A) |
Quantities
substructure | concrete volume | 4 700 m³ |
reinforcing steel | 838 t | |
superstructure | structural steel | 2 600 t |
concrete volume | 2 400 m³ | |
reinforcing steel | 720 t |
Design Loads
live load | LM1 (DIN EN 1991-2) |
Cost
cost of construction | Euro 20 500 000 |
Materials
piers |
reinforced concrete
(C 30/37)
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
(C 30/37)
|
girders |
steel
|
Participants
Owner
Client
Design
Structural engineering
Soil investigation report
Architectural consulting
-
Niedersächsische Landesbehörde für Straßenbau und Verkehr
- Günter Dehmel (architectural consultant)
Checking engineering
- Hans Kruse (checking engineer)
Co-contractor
Steel construction
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2020. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2020, pp. 39-52.
- Gegenüberstellung zweier Nachweisverfahren bei der Planung der neuen Estebrücke in Buxtehude. In: Bautechnik, v. 61, n. 2 (February 1984), pp. 41-44. (1984):