General Information
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
Twin girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Construction method: |
Longitudinal launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Le Genest-Saint-Isle, Mayenne (53), Pays de la Loire, France Saint-Berthevin, Mayenne (53), Pays de la Loire, France |
---|---|
Part of: | |
Coordinates: | 48° 5' 12.04" N 0° 50' 56.92" W |
Technical Information
Dimensions
width | 11.62 m | |
length | 259 m | |
span lengths | 26.125 m - 4 x 30.00 m - 26.125 m - 26.750 m - 31.00 m - 27.00 m | |
number of spans | 9 | |
girder depth | 2.20 m | |
piers | number | 8 |
Quantities
structural steel | 540 t | |
concrete volume | 5 400 m³ | |
reinforcing steel | 700 t | |
sheet piling | 930 m² | |
total length of piles | 550 m |
Design Loads
design speed | 350 km/h |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Conceding authority
Concessionaire
Architecture
- Jean-Pierre Duval (architect)
-
Architecture NEEL
- Fabrice Néel (architect)
Contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les ouvrages d'art de la LGV BPL. In: Travaux, n. 912 (January 2015), pp. 82-88. (2015):
- About this
data sheet - Structure-ID
20070834 - Published on:
04/03/2016 - Last updated on:
04/03/2016