0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Essalam-Salé Tramway Bridge

General Information

Beginning of works: December 2018
Completion: September 2020
Status: in use

Project Type

Location

Location: , ,
Coordinates: 34° 2' 0.80" N    6° 47' 27.10" W
Show coordinates on a map

Technical Information

Dimensions

main span 60 m
length 180 m
span lengths 8 x 15 m - 60 m
number of spans 9
girder depth 1.7 m

Cost

construction cost (without tax) Euro 6 000 000

Materials

piers reinforced concrete
arch steel (S 355)
deck slab reinforced concrete
abutments reinforced concrete
main girders steel (S 355)

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20082621
  • Published on:
    25/04/2022
  • Last updated on:
    25/04/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine