0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Espíritu Santo Trail Bridge

General Information

Beginning of works: 15 October 2018
Completion: 2018
Status: in use

Project Type

Location

Location: , ,
Coordinates: 17° 0' 47.77" S    65° 32' 52.53" W
Show coordinates on a map

Technical Information

Dimensions

span 132 m

Materials

cables steel wire
anchorages reinforced concrete
deck flooring Almendrillo

Notes

The bridge built by Bridges to Prosperity serves around 1400 people in the communities of Avispas.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084724
  • Published on:
    27/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine