General Information
Completion: | 2009 |
---|---|
Status: | in use |
Project Type
Material: |
Structurae Plus/Pro - Subscribe Now! |
---|---|
Function / usage: |
lower deck: Bicycle and pedestrian bridge upper deck: Road bridge |
Structure: |
upper deck: Haunched girder bridge |
Material: |
upper deck: Prestressed concrete bridge |
Structure: |
upper deck: Box girder bridge upper deck: Three-span continuous girder bridge |
Construction method: |
upper deck: Balanced cantilever method |
Location
Location: |
Clallam County, Washington, USA |
---|---|
Replaces: |
Elwha River Bridge (1913)
|
Coordinates: | 48° 6' 49.67" N 123° 33' 13.72" W |
Technical Information
Dimensions
upper deck | ||
---|---|---|
main span | 77.72 m | |
total length | 176.78 m | |
number of spans | 3 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Structural engineering
-
BergerABAM Engineers Inc.
- Michael D. McDonagh (structural engineer)
- Greg Banks (structural engineer)
- Robert Fernandes (structural engineer)
Project management
Relevant Web Sites
- About this
data sheet - Structure-ID
20057001 - Published on:
26/07/2010 - Last updated on:
05/02/2016