0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2 May 1987
Status: in use

Project Type

Structure: Cable-supported structure
Material: Concrete structure
Function / usage: Statue or Sculpture

Location

Location: , , ,
Coordinates: 41° 25' 5.45" N    2° 8' 44.26" E
Show coordinates on a map

Technical Information

Dimensions

concrete width 7.20 m
height 6.50 m
length 12 m
weight 490 kN
stay cables number of cables 4

Materials

cables prestressing steel

Chronology

1 May 1998

Two prestressing bars rupture due to what is later determined to be corrosion accelerated by fatigue. The body of the sculpture falls to the ground without, however, suffering any major damage.

Participants

Initial construction (1987)
Design
Structural engineering
Prestressing
Restoration (1998)
Structural engineering
Prestressing

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20076257
  • Published on:
    30/10/2018
  • Last updated on:
    30/10/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine