0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Elbebrücke Schönebeck
Beginning of works: 1910
Completion: 30 November 1912
Status: in use

Project Type

Function / usage: Road bridge
Material: Steel bridge
Structure: original configuration:
Arch bridge
current configuration:
Deck truss bridge

Location

Location: , , ,
Crosses:
  • Elbe River
Coordinates: 52° 1' 29.03" N    11° 44' 20.78" E
Show coordinates on a map

Technical Information

Dimensions

total length 584.50 m
span lengths 13.00 m - 12.69 m - 72.60 m - 60.90 m - 4 x 56.00 m - 6 x 33.60 m
number of spans 14
bridge surface 7 144.79 m²
deck deck width 11.95 - 13.12 m

Quantities

Rehabilitation
structural steel 450 t
concrete volume 1 020 m³

Design Loads

live load 30/30 [DIN 1072]

Cost

Rehabilitation
cost of construction German Mark 18 000 000

Materials

truss steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20056395
  • Published on:
    27/04/2010
  • Last updated on:
    20/10/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine