General Information

Official designation: BW 15
Beginning of works: 1995
Completion: December 1998
Duration of works: 41 months
Status: in use

Project Type

Location

Location: , ,
Carries:
  • Autobahn A4
Crosses:
  • Elbe River
Part of:
Replaces: Dresden Elbe Bridge (1936)
Coordinates: 51° 4' 24.05" N    13° 40' 21.50" E
Show coordinates on a map

Technical Information

Dimensions

main span 130.00 m
total length 496.00 m
span lengths 55 m - 73 m - 130 m - 73 m - 68 m - 56.6 m - 40.4 m
number of spans 7
bridge surface 21 328 m²
height above valley floor or water max. 38 m
total width 43.3 m
deck deck depth 3.42 - 5.92 m

Quantities

concrete volume 23 900 m³
reinforcing steel 2 500 t
deck structural steel 5 200 t

Cost

cost of construction German Mark 61 000 000
cost of construction per m² German Mark 2845

Materials

deck slab reinforced concrete
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007888
  • Published on:
    17/01/2003
  • Last updated on:
    19/01/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine