0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 23 August 2017
Completion: 18 January 2018
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Iyas river.
Coordinates: 13° 34' 53.48" N    85° 11' 51.71" W
Show coordinates on a map

Technical Information

Dimensions

span 90 m

Materials

cables steel wire
anchorages reinforced concrete
deck flooring timber

Notes

The bridge built by Bridges to Prosperity serves around 5235 people.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084652
  • Published on:
    25/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine