General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Single-cell box girder bridge |
Construction method: |
Movable Scaffolding System |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Neunburg vorm Wald, Schwandorf (Kreis), Bavaria, Germany |
---|---|
Coordinates: | 49° 20' 59.43" N 12° 26' 52.81" E |
Technical Information
Dimensions
main span | 37.5 m | |
deck depth | 2.2 m | |
total length | 360 m | |
span lengths | 30 m - 8 x 37.5 m - 30 m | |
deck width | 11.94 m | |
number of spans | 10 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Initial construction (1972-1974)
Owner
Client
Design
Prestressing
Monitoring
Consulting engineers
- matrics engineering GmbH (coupling joints)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20071083 - Published on:
12/04/2016 - Last updated on:
12/04/2016