General Information
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Großarl, Salzburg, Austria |
---|---|
Address: | L 109 Großarler Landstraße |
Coordinates: | 47° 17' 20.41" N 13° 13' 8.04" E |
Technical Information
Dimensions
length | 50.69 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Egg-Graben-Brücke, Wildbrücke AM2, Lafnitzbrücke – Anwendung von neuen Bauverfahren für Brücken in Österreich. Presented at: 25. Dresdener Brückenbausysmposium, 9./10. März 2015, Dresden (Germany). (2015):
- Entwurf und Konstruktion der Egg-Graben Brücke. In: Beton- und Stahlbetonbau, v. 105, n. 10 (October 2010), pp. 631-639. (2010):
- (2010): New Approach for Bridges with Very High Durability. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 258-259.
- About this
data sheet - Structure-ID
20059152 - Published on:
08/12/2010 - Last updated on:
05/02/2016