Entwurf und Konstruktion der Egg-Graben Brücke
Author(s): |
Johannes Berger
Sebastian Zoran Bruschetini-Ambro Werner David Thomas Mayrhuber |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Beton- und Stahlbetonbau, October 2010, n. 10, v. 105 |
Page(s): | 631-639 |
DOI: | 10.1002/best.201000038 |
Abstract: |
Design and Construction of the Egg-Graben BridgeDue to the high maintenance costs of bridges, there are now various approaches to enhance the durability. Post tensioned bridges without steel reinforcement represent one of these approaches. To investigate the structural behaviour of such constructions, a research project was started and large-scale tests were carried out. The government of the province of Salzburg could be convinced of this innovative technology and tendered out the method for the construction of the Egg-Graben Bridge. For the arch bridge, which is curved in plan, the superstructure is prestressed without using further steel reinforcement. After a construction period of 18 months the bridge was opened to traffic in November 2009. The paper describes the technology, the design and the experience gained from the construction of the bridge. |
Keywords: |
concrete bridge full-scale experiments
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10058485 - Published on:
17/11/2010 - Last updated on:
13/08/2014