General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Double T-section girder bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Kirchheim an der Weinstraße, Bad Dürkheim (Kreis), Rhineland-Palatinate, Germany |
---|---|
Coordinates: | 49° 32' 22.54" N 8° 10' 17.96" E |
Technical Information
Dimensions
total length | 226 m | |
span lengths | 28.00 m - 5 x 34.00 m - 28.00 m | |
number of spans | 7 | |
bridge surface | 2 600 m² | |
number of lanes | 2 x 1 | |
deck | longitudinal slope | 1.652 % |
superelevation | 2.5 % | |
piers | diameter | max. 2.02 m |
height | 8.90 - 11.35 m | |
piles | diameter | 1.50 m |
superstructure | deck width | 11.50 m |
girder depth | 1.55 m |
Quantities
substructure | concrete volume | 690 m³ |
reinforcing steel | 60 t | |
superstructure | concrete volume | 2 290 m³ |
prestressing steel | 95 t | |
reinforcing steel | 220 t |
Design Loads
design code(s) | DIN EN 1991-2/NA |
Materials
superstructure |
prestressed concrete
(C 35/45)
|
---|---|
piers |
reinforced concrete
(C 45/55)
|
piles |
reinforced concrete
(C 30/37)
|
abutments |
reinforced concrete
(C 30/37)
|
Participants
Owner
Client
Design
Structural engineering
Soil investigation report
Architectural consulting
Checking engineering
- Rolf Wörner (checking engineer)
Contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2018. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2018, pp. 69-80.
- About this
data sheet - Structure-ID
20077334 - Published on:
30/04/2019 - Last updated on:
01/05/2019