0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1985
Completion: 1989
Status: in use

Project Type

Location

Location: , ,
Part of:
Location description:

Crosses underneath Victoria Harbour

Coordinates: 22° 17' 58.48" N    114° 13' 52.45" E
Coordinates: 22° 17' 21.08" N    114° 12' 43.33" E
Show coordinates on a map

Technical Information

Dimensions

total length 2.25 km
length of immersed tube tunnel section 1 860 m
tunnel unit width 35.45 m
tunnel unit height 9.75 m
number of tunnel units 15

Materials

tunnel structure reinforced concrete

Chronology

1984

Pre-emptive study issued.

1985

Call for bids by Hong Kong Government.

1985

Franchise for construction and operation of tunnel awarded to The New Tunnel Company.

1989

Completion of construction.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008187
  • Published on:
    13/02/2003
  • Last updated on:
    11/03/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine