General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Girder bridge |
Construction method: |
Precast segmental construction |
Material: |
Prestressed concrete bridge |
Location
Location: |
Tsing Yi, Kwai Tsing, Hong Kong, China |
---|---|
Part of: | |
Coordinates: | 22° 19' 57.04" N 114° 6' 37.12" E |
Technical Information
Dimensions
main bridge | ||
---|---|---|
total length | 1.25 km |
Materials
deck |
precast prestressed concrete
|
---|
Notes
The main bridge is 1.25 km long while there are a total of 5 km of access ramps. 1 939 precast segments are cast for the superstructure.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Cutting edge. In: Bridge Design & Engineering, v. 10, n. 35 (2nd Quarter 2004), pp. 22-25, 27.
- Dragon's Tale. In: Bridge Design & Engineering, v. 13, n. 46 (1st Quarter 2007), pp. 34-35. (2007):
- (2008): East Tsing Yi Viaduct - A tough schedule to erect a concrete deck 7 km long. Presented at: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, pp. 410-411.
- High flyer. In: Bridge Design & Engineering, v. 12, n. 44 (3rd Quarter 2006), pp. 64.