0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2005
Completion: 20 December 2009
Status: in use

Project Type

Function / usage: Road bridge
Structure: Girder bridge
Construction method: Precast segmental construction
Material: Prestressed concrete bridge

Location

Location: , , ,
Part of:
Coordinates: 22° 19' 57.04" N    114° 6' 37.12" E
Show coordinates on a map

Technical Information

Dimensions

main bridge
total length 1.25 km

Materials

deck precast prestressed concrete

Notes

The main bridge is 1.25 km long while there are a total of 5 km of access ramps. 1 939 precast segments are cast for the superstructure.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20012430
  • Published on:
    04/07/2004
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine