East Tsing Yi Viaduct

General Information

Beginning of works: 2005
Completion: 20 December 2009
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge
Construction method: Segmental construction

Location

Location: , , ,
Part of:
Coordinates: 22° 19' 57.04" N    114° 6' 37.12" E
Show coordinates on a map

Technical Information

Dimensions

main bridge total length 1.25 km

Materials

deck precast prestressed concrete

Notes

The main bridge is 1.25 km long while there are a total of 5 km of access ramps. 1 939 precast segments are cast for the superstructure.

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Cutting edge. In: Bridge Design & Engineering, v. 10, n. 35 (2nd Quarter 2004), pp. 22-25, 27.
  • Droniou, Dominique (2007): Dragon's Tale. In: Bridge Design & Engineering, v. 13, n. 46 (1st Quarter 2007), pp. 34-35.
  • High flyer. In: Bridge Design & Engineering, v. 12, n. 44 (3rd Quarter 2006), pp. 64.
  • About this
    data sheet
  • Structure-ID
    20012430
  • Date created
    04/07/2004
  • Last Update
    05/02/2016