0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2009
Completion: 2015
Status: in use

Project Type

Function / usage: High-speed rail bridge
Structure: Box girder bridge
Material: Prestressed concrete bridge
Construction method: Incremental launching

Location

Location: , , ,
Crosses:
  • Duero
Coordinates: 41° 29' 58" N    5° 28' 9" W
Show coordinates on a map

Technical Information

Dimensions

total length 620 m
span lengths 40 m - 9 x 60 m - 40 m
deck width 14.0 m
number of spans 11

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Pérez-Fadón Martínez, Santiago / Herrero Beneitez, José Emilio / Salazar Hernández, José Martín (2008): Viaducto de la Gineta y otros puentes empujados de AVE. Presented at: IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008.
  • About this
    data sheet
  • Structure-ID
    20068202
  • Published on:
    08/01/2016
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine