0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2000
Completion: 2004
Status: in use

Project Type

Function / usage: High-speed rail tunnel
Construction method: Immersed tube method
Structure: Immersed tube tunnel

Location

Location: , ,
, ,
Address: N217
Part of:
Coordinates: 51° 43' 47.27" N    4° 38' 11" E
Coordinates: 51° 44' 31.24" N    4° 37' 25.35" E
Show coordinates on a map

Technical Information

Dimensions

width 17.70 m
total length 2 588 m
tunnel length 1 488 m

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20011842
  • Published on:
    19/04/2004
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine