General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
High-speed rail tunnel |
Construction method: |
New Austrian Tunnelling Method (NATM) |
Location
Location: |
Girod, Westerwaldkreis, Rhineland-Palatinate, Germany |
---|---|
Part of: |
|
Coordinates: | 50° 26' 3.12" N 7° 52' 46.94" E |
Coordinates: | 50° 25' 49.98" N 7° 53' 7.26" E |
Technical Information
Dimensions
tunnel length | 575 m |
Quantities
concrete volume | 16 915 m³ | |
reinforcing steel | 1 315 t | |
volume of extracted material | 76 910 m³ |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Tunnelbauwerke der Neubaustrecke Köln-Rhein/Main. In: Eisenbahntechnische Rundschau ( 2000), pp. 13-19. (2000):