0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1951
Completion: 1959
Status: in use

Project Type

Function / usage: Road tunnel
Structure: Tunnel
Construction method: Cut-and-cover method

Location

Location: , , ,
Part of:
Coordinates: 42° 20' 54.34" N    71° 3' 26.90" W
Show coordinates on a map

Technical Information

Dimensions

length 701 m
number of lanes 6
number of tubes 2

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20023779
  • Published on:
    16/10/2006
  • Last updated on:
    02/06/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine