General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Box girder bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Location
Location: |
Pacifica, San Mateo County, California, USA |
---|---|
Address: | CA 1 |
Connects to: |
Tom Lantos Tunnels (2013)
|
Coordinates: | 37° 35' 1" N 122° 30' 33" W |
Technical Information
Dimensions
main span | 135.64 m | |
bridge 1 | total length | 275.54 m |
bridge 2 | total length | 296.27 m |
Participants
Design
Contractor
Prestressing
Formwork
Form travelers
Relevant Web Sites
Relevant Publications
- Devil's Slide Opens Possibilities. In: ASPIRE (Winter 2008). (2008):
- Devilishly difficult. In: Bridge Design & Engineering, v. 14, n. 50 (1st Quarter 2008), pp. 68-69.
- About this
data sheet - Structure-ID
20035495 - Published on:
13/03/2008 - Last updated on:
26/09/2024