General Information
Other name(s): | Deustuko zubia |
---|---|
Completion: | December 1936 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Double-leaf bascule bridge |
Material: |
Steel bridge |
Location
Location: |
Bilbao, Biscay, Basque Country, Spain |
---|---|
Part of: | |
Coordinates: | 43° 16' 9.81" N 2° 56' 26.12" W |
Technical Information
There currently is no technical data available.
Chronology
1938 — 1939 | Reconstruction of the bridge during the Spanish Civil War. |
---|
Participants
Design
- Ricardo Bastida (architect)
- José Ortiz de Artiñano (engineer)
- Ignacio Rotaeche (engineer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- El puente de Deusto. Diputación Foral de Bizkaia, Bilbao (Spain). (1997):
- About this
data sheet - Structure-ID
20045441 - Published on:
15/06/2009 - Last updated on:
01/09/2016