General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
High-speed rail tunnel |
Construction method: |
Cut-and-cover method |
Location
Location: |
Denkendorf, Eichstätt (Kreis), Bavaria, Germany |
---|---|
Part of: | |
Coordinates: | 48° 56' 7.17" N 11° 27' 35.54" E |
Coordinates: | 48° 55' 10.99" N 11° 28' 11.27" E |
Technical Information
Dimensions
length | 1 950 m | |
number of tracks | 2 | |
number of tubes | 1 |
Materials
tunnel structure |
reinforced concrete
|
---|
Participants
Owner
Checking engineering
Co-contractor
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20003958 - Published on:
24/06/2002 - Last updated on:
28/05/2021