Deh Cho Bridge
-
Schüller, Matthias (2009): Deh Cho Bridge im Norden Kanadas. In: Brückenbau, v. 1, n. 4-1 ( 2009- 2010), pp. 77.
-
Deh Cho Bridge one-year delay blamed on design changes. In: Bridge Design & Engineering, v. 15, n. 56 (3rd Quarter 2009), pp. 8.
-
Schüller, Matthias / Singh, Prabhjeet Raj (2010): Fast mover. Effective use of software has been central to a redesign which took just five months. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010), pp. 52.
-
New contractors take the helm on De Cho Bridge. In: Bridge Update, n. 91 (April 2010), pp. 1.
-
Singh, Prabhjeet Raj / Schüller, Matthias (2010): Remote control. A major bridge crossing in Canada's remote Northwest Territories is set to move ahead again after being halted for an extensive and rapid redesign. In: Bridge Design & Engineering, v. 16, n. 58 (1st Quarter 2010), pp. 30-31.