0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Deh Cho Bridge

Structurae a catalogué 5 publication(s) pertinentes.

  1. Schüller, Matthias (2009): Deh Cho Bridge im Norden Kanadas. Dans: Brückenbau, v. 1, n. 4-1 ( 2009- 2010), pp. 77.
  2. Deh Cho Bridge one-year delay blamed on design changes. Dans: Bridge Design & Engineering, v. 15, n. 56 (3e trimestre 2009), pp. 8.
  3. Schüller, Matthias / Singh, Prabhjeet Raj (2010): Fast mover. Effective use of software has been central to a redesign which took just five months. Dans: Bridge Design & Engineering, v. 16, n. 58 (1er trimestre 2010), pp. 52.
  4. New contractors take the helm on De Cho Bridge. Dans: Bridge Update, n. 91 (avril 2010), pp. 1.
  5. Singh, Prabhjeet Raj / Schüller, Matthias (2010): Remote control. A major bridge crossing in Canada's remote Northwest Territories is set to move ahead again after being halted for an extensive and rapid redesign. Dans: Bridge Design & Engineering, v. 16, n. 58 (1er trimestre 2010), pp. 30-31.