0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Promenade Bridge
Beginning of works: 2014
Completion: 2015
Status: in use/under construction

Project Type

Material: Prestressed concrete bridge
Structure: Girder bridge
Support conditions:
Material: Structurae Plus/Pro - Subscribe Now!
Function / usage: upper deck:
Road bridge
lower deck:
Bicycle and pedestrian bridge

Location

Location: , ,
Coordinates: 51° 51' 21.71" N    5° 51' 42.96" E
Show coordinates on a map

Technical Information

Dimensions

total length 220 m
span lengths 30 m - 52 m - 56 m - 52 m - 30 m
number of spans 5
bridge surface 4165 m²

Cost

cost of construction Euro 10 800 000

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20067285
  • Published on:
    11/07/2015
  • Last updated on:
    07/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine