0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Donautalbrücke; Vierte Donaubrücke Linz
Other name(s): A26 Danube River Bridge
Beginning of works: January 2019
Completion: 2024
Status: under construction

Project Type

Location

Location: , ,
Crosses:
  • Danube
Part of:
Carries: A 26 Motorway (Austria) (2025)
Connects to: Freinberg Tunnel (2032)
Coordinates: 48° 18' 20.84" N    14° 16' 5.87" E
Show coordinates on a map

Technical Information

Dimensions

span 305 m
bridge surface 6 890 m²
number of lanes 2 x 2
abutments number 2
anchorages number 4
cables diameter 0.145 m
length ca. 500 m
length ca. 500 m
number 2 x 12
deck deck depth 2.530 m
deck width 22.54 m
suspenders diameter 0.095 m
on-center spacing between suspenders 14.55 m

Materials

cables steel wire
suspenders steel wire
deck slab reinforced concrete
cross beams steel
girders steel

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20010512
  • Published on:
    18/10/2003
  • Last updated on:
    08/11/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine