On a remote location, where a mighty river plunges 15 meters into seething foam, spilling an average of approx. 459,660 gallons per second, Canada' ...
more
PERI devised and supplied an optimised and safe formwork and scaffolding solution for construction of the Foz Tua Dam and the associated pumped-sto ...
more
With the flooding of a canal section in June 2015, tests have begun in readiness for the scheduled opening of the expansion project in 10 months ti ...
more
The Solingen municipal utility invited tenders for the refurbishment of the wall air side of the Sengbach Dam. This required a scaffold structure t ...
more
After one hundred years, the shaft lock at the Minden waterway junction has become obsolete. Now CEMEX Deutschland AG delivered ready-mixed concret ...
more
Structurae Plus subscribers can download 30 media files or data sets per month.
Structurae Pro users are limited to 50.
Do you really want to delete this item from your favorites?
The item was successfuly added to the shopping cart.Could not add item to the shopping cart. Please try again.This item has already been added to the shopping cart and cannot be added again.