0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2013
Status: in use

Project Type

Location

Location: ,
, ,
Location description: The bridge crosses the Mbirurume river.
Coordinates: 2° 13' 22.61" S    29° 31' 46.60" E
Show coordinates on a map

Technical Information

Dimensions

span 68 m

Materials

cables steel wire
anchorages reinforced concrete
deck flooring timber

Notes

The bridge built by Bridges to Prosperity serves around 2400 people in the communities of Nyarusangee - Kivumu - Kirenzi.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084625
  • Published on:
    25/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine