0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Pye's Bridge
Status: in use

Project Type

Location

Location: , , , ,
Crosses:
  • River Cam
Coordinates: 52° 12' 37.41" N    0° 8' 3.76" E
Show coordinates on a map

Technical Information

Materials

truss steel

Chronology

November 2003

Bridge is closed after the top steel chord moved out of line by 120 mm.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20011803
  • Published on:
    16/04/2004
  • Last updated on:
    20/09/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine