General Information
Status: | in use |
---|
Project Type
Structure: |
Twin girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Bourgnac, Dordogne (24), Nouvelle-Aquitaine, France |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 45° 1' 12.60" N 0° 23' 17.06" E |
Technical Information
Dimensions
total length | 307 m | |
span lengths | 29.75 - 49.50 m | |
pier height | 11 - 19 m | |
deck | deck width | 11 m |
Quantities
structural steel | 1 400 t | |
concrete volume | 6 830 m³ | |
reinforcing steel | 1 090 t |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Owner
Client
Architecture
- Charles Lavigne (architect)
- Alain Montois (architect)
Civil works
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Section Montpon / Mussidan: le viaduc de la Crempse est terminé. In: Travaux, n. 768 (October 2000), pp. 31-32.
- About this
data sheet - Structure-ID
20007128 - Published on:
07/12/2002 - Last updated on:
19/04/2017