General Information
Other name(s): | Coupurebrug |
---|---|
Completion: | 2002 |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Vertical lift bridge |
Material: |
Weathering steel bridge |
Structure: |
Girder bridge with suspended deck |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bruges, West Flanders, Flanders, Belgium |
---|---|
Coordinates: | 51° 12' 17.39" N 3° 14' 12.12" E |
Technical Information
Materials
pylons |
reinforced concrete
|
---|---|
girders |
steel tubes
|
Notes
The deck is suspended from two tublar steel girders. These girders can be rotated which causes the suspenders to be rolled up on the tubes and the deck to lift vertically.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Fußgängerbrücken. Konstruktion, Gestalt, Geschichte. Birkhäuser, Basel (Switzerland), ISBN 978-3-7643-8138-7, pp. 188. (2007):
- About this
data sheet - Structure-ID
20013061 - Published on:
25/08/2004 - Last updated on:
12/06/2021